This page has been automatically translated from English. [Click here to view original web page]

Design Directory Dexigner Start Design Database Dexigner Design Agenda Dexigner Newsletter Turkish
Dexigner Logo Dexigner Concept
Product DesignProduct DesignGraphic DesignGraphic DesignFashion and Jewellery DesignFashion and Jewellery DesignArchitectureArchitectureDigital DesignDigital DesignArtArt

cortítulo



A revisão de projeto comenta para Londres 2012 projetos

A revisão de projeto comenta para Londres 2012 projetos

O centro aquático, o estádio olímpico e o projeto e a estrutura urbanos da paisagem para a Londres 2012 Jogos Olímpicos todos mostram a promessa e o potencial, de acordo com CABE e projeto para Londres.

O painel de revisão do projeto de Londres 2012 disse que as plantas do esporte de HOK para um estádio olímpico provisório eram “inauditas”.

A idéia evita inteligente o risco corrido por uma estrutura permanente, de transformar-se um ele branco.

O drama de suas construção e desmontagem podia mesmo ser uma parte importante do espetáculo olímpico.

Havia igualmente um elogio para o centro aquático dos arquitetos de Zaha Hadid com seu telhado escultural, embora os detalhes cruciais desse telhado ainda precisassem o desenvolvimento.

CABE e projeto para o projeto gostado Londres de EDAW e de aliados e de Morrison e a estrutura urbanos da paisagem, e encontrado lhe detalhado e estruturado bem.

Deram boas-vindas à estratégia para tratar os edifícios das utilidades como as características arquitectónicas significativas integradas no parque, que pode então actuar como um legado visível do Jogos Olímpicos sustentáveis.

Mas não era todo o elogio. Os revisores são referidos sobre as pontes no centro aquático e as pontes do estádio no parque olímpico por causa da maneira que estão sendo tratados no processo de planeamento.

As pontes do estádio estão sendo consideradas como as matérias reservados que planeiam a aplicação que não define elementos importantes do projeto.

CABE e o projeto para Londres incitaram uma aproximação por toda parte integrada e coerente.


more: www.cabe.org.uk/default.aspx?con... (119)

design directory: CABE: Commission for Architecture and the Built Environment > Architecture Resources


April 15, 2008 | Viewed 32,260 time(s)

Dexigner Side Latest News
Vormator The Elements of Design Vormator: The Elements of Design
Interior Design Show 2009 Interior Design Show
Singapore to Host the 26th Icsid World Design Congress in 2009 Icsid World Design Congress
Spectrum West Collection Spectrum West Collection
World Design Capital 2012 Bid Launched World Design Capital 2012 Bid Launched
Red Dot Award Product Design 2009 Red Dot Award
UK Businesses Turn to Designers to Beat the Recession UK Businesses Turn to Designers to Beat the Recession
Flash on Tap Sets Spring Conference Dates in Boston Flash on Tap
Superfad Returns To X Games With Multi-Platform Campaign Superfad Returns To X Games With Multi-Platform Campaign
Kartell Design Receives a 2008 Good Design Award Kartell Design Receives a 2008 Good Design Award
New York School of Interior Design Announces Public Programs for Spring 2009 New York School of Interior Design Announces Public Programs for Spring 2009
New Media School Morphogenesis of School Typologies New Media School: Morphogenesis of School Typologies
Pantone 2010 Multi-Discipline Forecast Pantone 2010 Multi-Discipline Forecast
Rapid Change in Design The Changing Landscape and New Rules for Design Project Rapid Change in Design: The Changing Landscape and New Rules for Design Project
Computation The New Realm of Architectural Design Computation
Drinks with a Designer Nicholas Leahy at TKTS Booth Times Square Nicholas Leahy at TKTS Booth
Design Directory | Design Database | Design Agenda | Newsletter | Start | Mobile | Link to Us | Contact & About Us
XML
© 2001-2008 Dexigner™ Network | Design News | A revisão de projeto comenta para Londres 2012 projetos
    Italiano | Alemão | Francês | Espanhol | Português | Holandês | Russo | Japonês | Chinês | Coreano